Engineering works in October and November

9/25/2017
Several engineering works are planned for October and November.

You can find details about the different construction sites on our homepage ("Current work sites", "Future work sites").

Train services disrupted for a week:

Line 10 (Luxembourg – Troisvierges – Gouvy): between Ettelbruck-Troisvierges and Kautenbach-Wiltz

Line 10 between Ettelbruck and Troisvierges as well as between Kautenbach and Wiltz will be closed for one week from 28th October until 5th November.

Line 60 (Luxembourg – Esch-sur-Alzette – Rodange): between Esch/Alzette and Rodange


Line 60 between Esch/Alzette and Rodange will be closed for one week  from 28th October until 5th November.

Train services disrupted for several weekends:

Line 10 (Luxembourg – Troisvierges – Gouvy): between Luxembourg and Ettelbruck

Due to major engineering works on the new viaduct Pulvermühle, the line 10(Luxembourg – Troisvierges – Gouvy) between Luxembourg and Ettelbruck is closed on the weekends 30th September/1st October, 7th/8th October, 14th/15th October and 21st/22nd October.


Line 30 (Luxembourg – Wasserbillig – Trèves): between Luxembourg and Oetrange

Due to major engineering works on the line 30 (Luxembourg  – Wasserbillig – Trier) between Luxembourg and Oetrange is closed on the weekends 30th September/1st October, 7th/8th October, 14th/15th October and 21st/22nd October.

Overnight disruptions:

Line 30 (Luxembourg – Wasserbillig – Trier): between Oetrange and Wasserbillig

Until 7th October line 30 between Oetrange and Wasserbillig is closed overnight from Monday to Friday (20:00 to 04:00). Train replacement bus services run from 22:15 between Oetrange and Wasserbillig respectively Trier and return.

Press release (in French)

Please fine on our BLOG further information about the modernisation and maintenace works. 

Back to the list

News