The construction site of the new intermodal terminal - global views


Mid-April 2017: Aerial view of the entire site of the new intermodal terminal, with the marshalling yard in the background, direction north-east. and the highway A13 in the forefront. Behind the highway, you see the entrance gate, the parking for semi-trailers and the administrative buildings. Behind that, the combined train tracks and the rail motorway platform.  In the background, on the right, the new CFL multimodal central warehouse.
vue aérienne chantier terminal intermodal 20170414 

Mid-March 2017: View looking south. Background right: highway A13. Right: administrative building + parking spaces. Middle: container terminal + rail motorway platform. Left: marshalling yard. Background left: new CFL multimodal central warehouse.
project-new-intermodal-terminal/170316-vue-a%C3%A9rienne-chantier-nouveau-terminal-intermodal-CFL-direction-sud-2

Mid-March 2017: View looking North. Left: container terminal. Middle: rail motorway platform. Front, right: central control post. Background, right: marshalling yard.
project-new-intermodal-terminal/170316-vue-a%C3%A9rienne-chantier-nouveau-terminal-intermodal-CFL-direction-sud-1

Mid-December 2016: View looking north-west. Left: highway A13 + administrative building. Middle: parking spaces + container terminal. Right: rail motorway platform.
161220-vue-aérienne-chantier-nouveau-terminal-direction-nord-ouest.png

Mid-October 2016: View from south-east looking north-west. Left: administrative building. Middle: container terminal and rail motorway platform. Right: marshalling yard​.​
​ ​161018-vue-globale-chantier-nouveau-terminal-direction-nord-ouest


Mid-October 2016: Aerial view of the entire construction site of the new intermodal terminal, seen from the north-east direction south-west, with the marshalling yard on the left.
In the middle: tracks of the rail motorway platform, then the combined tracks and the 2 portal cranes. On the right: gage control gate.
161018-vue-aérienne-chantier-nouveau-terminal-direction-sud-ouest 
 

Mid-October 2016: Aerial view of the entire construction site of the new intermodal terminal, with the marshalling yard in the background, direction north-east. and the highway A13 in the forefront, at the bottom, in the south-west.
Behind the highway, you can see the gage control gate, the parking for semi-trailers and the administrative buildings. Behind that the combined train tracks and the rail motorway platform.  In the background, on the right, the new CFL multimodal central warehouse. 
161018-vue-aérienne-chantier-nouveau-terminal-direction-nord-est

Early September 2016: Aerial view of the entire construction site of the new intermodal terminal, seen from the north-east direction south-west, with the marshalling yard on the left.
In the middle: tracks of the rail motorway platform, then the combined tracks and the 2 portal cranes. On the right: gage control gate.
160909-vue-aérienne-chantier-nouveau-terminal-direction-sud-ouest

Early September 2016: Aerial view of the entire construction site of the new intermodal terminal, seen from the north-west direction east.
In the background, the new CFL multimodal central warehouse. In front of that, the marshalling yard tracks, the new rail motorway platform and the 2 combined rail tracks with the portal cranes. In the middle, the future parking for semi-trailers.  On the right: the administrative building and the entrance gate, with highway A13 at the far right.
160909-vue-aérienne-chantier-nouveau-terminal-direction-sud-est

Early September 2016: View from south-east looking north-west. Left: administrative building. Middle: container terminal and rail motorway platform. Right: marshalling yard.​
160909-vue-globale-chantier-nouveau-terminal-direction-nord-ouest


Mid-August: View from south-east looking north-west. Left: administrative building. Middle: container terminal and rail motorway platform. Right: marshalling yard.
 ​160811-vue-aerienne-chantier-nouveau-terminal-direction-nord-ouest


Early August: View from the north-east, looking south-west. Left: new CFL multimodal central warehouse. Middle: marshalling yard and new intermodal terminal. Foreground, towards the right: current terminal.
160807-vue-aerienne-chantier-nouveau-terminal-direction-sud-ouest

Late June 2016: Aerial view of the entire construction site of the new intermodal terminal, seen from the north-west direction east.
In the background, the new CFL multimodal central warehouse. In front of that, the marshalling yard tracks, the new rail motorway platform and the 2 combined rail tracks with the 2 portal cranes. In the middle, the future parking for semi-trailers.  On the right: the administrative building and the entrance gate, with highway A13 at the far right.160629-vue-aérienne-chantier-nouveau-terminal-direction-sud-est


Late
 June 2016: Aerial view of the entire construction site of the new intermodal terminal, seen from the west direction east.
In the background, the marshalling yard tracks, the new rail motorway platform and the 2 combined rail tracks with the 2 portal cranes. On the left, the gage control gate and repair workshop. In the middle, the future parking for semi-trailers.​

160629-vue-aérienne-chantier-nouveau-terminal-direction-est 


Early June 2016: Aerial view of the entire construction site of the new intermodal terminal, seen from the north-east direction south-west, with the marshalling yard on the left.
In the middle: tracks of the rail motorway platform, then the 2 portal cranes and the administrative buildings. On the right: gage control gate and repair workshop.
160609-vue-chantier-nouveau-terminal-direction-sud-ouest


Early June 2016: Aerial view of the entire construction site of the new intermodal terminal, with the marshalling yard in the background, direction north-east. and the highway A13 in the forefront, at the bottom, in the south-west.
Behind the highway, you can see the parking and the administrative buildings, the 2 gantry cranes, the rail motorway platform, the tracks of the marshalling yard, and the industrial zones Krakelshaff and Riedgen.

20160609-vue-chantier-nouveau-terminal-direction-nord-est 


 

Early April 2015: Aerial view of the entire construction site of the new intermodal terminal, with the marshalling yard in the background and the highway A13 on the bottom right.Vue globale chantier nouveau terminal intermodal - fin mars 2015 

  ​

Early September 2014:  View of the entire construction site of the new intermodal terminal. On the left / south side: highway A13. In the background and on the right, on the north-east side: Bettembourg marshalling yard.
The excavation work (removal of hills and filling around river) has started. The temporary bridge over the Bettembourg-Dudelange rail line is operational. A stockpile of gravel to be used as substructure for the platform has been created.
Vue globale chantier début septembre 2014